National Trust logo

The 19th century stable yard

The 19th century stable yard
NTPL Zoƫ Colbeck

Friday, 26 October 2012

Living it green in Lille

Every 6 months all the European partners in the Livinggreen Project get together in one of our cities to plan the next stage of the project and sometimes hold a public event. This week it was time to go to Lille, in northern France.

The main square in Lille, with its 17th century buildings (NTPL/Caroline Pankhurst)

The day before our meeting we held a public event in Lille City Hall on the topic of 'Eco-renovation and the architectural value of housing - constraints or opportunities?'. The day was well attended by local property developers, architects, engineers, landlords, home owners etc.

The public event in the City Hall (NTPL/Caroline Pankhurst)

The day included a visit to one of four sites nearby, to see eco-renovation in progress in different types of building. I visited a small courtyard, hidden away off the street, where lots of small terraced houses are being renovated. I particularly liked the 'Metisse' insulation, made from recycled denim jeans by a local social enterprise.

The small courtyard with houses on both sides (NTPL/Caroline Pankhurst)

The blue 'Metisse' insulation made from recycled jeans (NTPL/Caroline Pankhurst)

Our partner meeting itself included a visit to the French building in our Livinggreen project - an inner city warehouse from the end of the 19th century. This is being renovated into a centre of sustainable housing, which will offer advice and information on various aspects of sustainable living, in a similar way to our Livinggreen Exhibition here in Morden. It will open in 2013.

The Livinggreen warehouse (NTPL/Caroline Pankhurst)

And as seems to happen on these visits, I found myself using my few hours of spare time to visit a renovated building - this time an amazing museum in an old art deco swimming pool - the Museum of Art and Industry in Roubaix. Well worth a visit if you're ever in Lille (after the sustainable housing centre, once it's open!).

 The Museum of Art and Industry, Lille (NTPL/Caroline Pankhurst)

Friday, 12 October 2012

How much pedalling does it take to power a light bulb?

Our Livinggreen Exhibition has just got an exciting new interactive exhibit - the Geffrye Museum in Hackney has kindly given us one of theirs. Visitors can now pedal with their hands to find out how much energy is used to power 3 different sorts of lightbulb.

James and Paul deliver the exhibit into the stable yard (NTPL/Caroline Pankhurst)

Volunteers Sophie and Daniel try out the new exhibit (NTPL/Caroline Pankhurst)

Meanwhile our waterwheel and turbine have had exciting new additions too. The waterwheel has finally had its outer bearing replaced - this was missing for years but was found recently down the River Wandle at Abbey Mills. We've now got it back, painted it and Paul and James braved the river to get it back into place.

Paul and James get ready to brave the river (NTPL/Caroline Pankhurst)

Paul clears the weeds off the wheel... (NTPL/Caroline Pankhurst)

...puts the bearing in place (NTPL/Caroline Pankhurst)

....and gets a hand back down into the river (NTPL/Caroline Pankhurst)

The Archimedes Screw turbine now has nice black railings around it, a new path and a new interpretation panel, so that visitors can properly enjoy it.

 
Dave from Mackleys comes back to check the new path (NTPL/Caroline Pankhurst)

The turbine in the autumn sunshine with its new interpretation panel (NTPL/Caroline Pankhurst)

Friday, 28 September 2012

Turbine opens for Open House

Last Friday 21 September we finally turned on our Archimedes Screw turbine, much to the delight of Morden Hall Park's staff and volunteers who had gathered to see it.

Staff and volunteers watch the turbine being turned on (NTPL/Caroline Pankhurst)

We then did tours of both the turbine and the stable yard for visitors coming to see us as part of Open House Weekend. Everyone seemed suitably impressed!

 Chas, volunteer tour guide, leads a tour of the turbine for Open House (NTPL/Caroline Pankhurst)

     Visitors look inside the generator housing (NTPL/Caroline Pankhurst)

The safety cover is now over the Screw, but it can still be seen clearly through it. We're now just finishing off the landscaping around it - installing a path so that people can get round it easily and painting the railings.
  
The cover is installed over the Screw in 3 sections (NTPL/Caroline Pankhurst)


Gareth of Stennett Landscapes starts building a fence around the site (NTPL/Caroline Pankhurst)

The turbine turning - with the green eel pass and frothy fish pass next to it (NTPL/Caroline Pankhurst)

The site isn't yet open all the time, but group tours can be booked in advance or individuals can ask in the Livinggreen Exhibition in the stable yard if there is someone available to show them around.

Wednesday, 19 September 2012

Clocks, carriages and cheese

So we're still eagerly anticipating the turning of the turbine, but in the meantime there's always something new happening in the stable yard.

Today we finally got the stable yard clock working, after a year of getting used to it always being 11.13. There are only two people in the country who have the skills to get it working - it was disconnected for the construction works - so finally one of them was able to come here. Now visitors can stop asking why it's not working and enjoys the chimes instead.

The clock finally says 11.43 instead of 11.13 (NTPL/Caroline Pankhurst)

The clock man from Cumbria climbs up to the clock with his head torch on (NTPL/Caroline Pankhurst)

There's a new attraction in the middle of the stable yard too - one of the original carriages has been painted and put back in the yard. Nick, our Parks & Gardens Manager, cleverly made some planters out of an old wooden bridge, to go next to the carriage, so they're full of flowers which set it off nicely.

The carriage and flowers in front of the solar slates (NTPL/Caroline Pankhurst)

Visitors enjoy a coffee with the new carriage and flowers (NTPL/Caroline Pankhurst)

Finally, if you haven't been here on a Saturday recently, you might not know that we have a farmers' market here each week - so next time you want some nice fruit, bread, fish, cheese etc, then you know where to come. It's every Saturday from 10-3.

 Visitors enjoy the new farmers' market (NTPL/Caroline Pankhurst)

Friday, 31 August 2012

The turning of the Screw

So London's first Archimedes Screw turbine is nearly complete!

The wall keeping the river out of the site has been broken down, so that the water can finally flow through it.


Breaking the wall down between the River Wandle and the Screw (NTPL/Caroline Pankhurst)

Then was lots of technical activity in the generator housing, then we had an exciting moment of the Screw being turned on to test it. This is a picture of it turning (we've also got a video but we won't share that just yet - let's wait for it to be turning properly....).

The Screw turns for the first time (NTPL/Caroline Pankhurst)

One of the screens in the generator housing (NTPL/Caroline Pankhurst)

The wooden capping was then fixed on top of the piles, an aluminium roof has been added to the generator housing and handrails have been installed so that visitors can look over it safely:

The wooden capping is laid on top of the piles (NTPL/Caroline Pankhurst)

The generator housing (beach hut) gets a shiny new roof (NTPL/Caroline Pankhurst)

The handrails around the Screw (NTPL/Caroline Pankhurst)

So it's almost ready, but those of you with very good memories will know that it was supposed to be turned on and generating electricity yesterday.....the only problem is that the safety cover to go over it isn't quite finished, so we need to wait to get that first. Hopefully it will come next week and we'll have a turning turbine then.


 The Screw waiting in the sunshine for its new cover (NTPL/Caroline Pankhurst)

If you want to be one of the first to see it turning, come for a tour on Open House Weekend, 22-23 September.

Tuesday, 21 August 2012

And it's goodbye from me...

...me being Zoƫ Adams, the Community Projects Manager for the project. My job involved setting up the Livinggreen exhibition centre, writing the exhibitions and the guidebook, running various events and activities and recruiting the volunteers. The funded part of the project is coming to an end, so I'm off to pastures new (namely the Natural History Museum in London).

Well, the last two years have flown by, and what a transformation it's been! I can remember arriving on my first day back in August 2010, looking at the project plan and wondering how we'd manage to do everything that we had set out to do.

It's hard to believe that the exhibition used to look like this! (c) NTPL

Looking at it today though, I think we've done a pretty good job. As I write, I can hear people outside enjoying the stable yard - we've had more than 24,000 visitors so far which is a great achievement.

What a tranformation! (c) NTPL / Louis Sinclair

Here are a few memories...

Best moment...
Has to be when the stable yard opened to the public for the first time. Watching the ribbon being cut and welcoming visitors to something that we'd worked so hard to create was pretty special. I've also enjoyed watching the volunteers grow as a team and make the project their own.


The Greensleeves Morris Men dancing at the grand opening. (c) NTPL

Worst moment...
Probably the day before the opening! Also the morning of the opening when I arrived to find that my first temporary exhibition had fallen down over night.
What I'll miss most...
Caroline (Project Coordinator) and the volunteers. We've worked hard, laughed a lot and enjoyed a few too many custard tarts along the way. The team here are fantastic and I'm sure that the Livinggreen Centre will continue to be a roaring success. I've also enjoyed the stable yard ice cream parlour a little too much in the hot weather.

So, all that's left for me to say is goodbye, thank you for reading, and wish good and green luck to Morden Hall Park for the future!

Monday, 13 August 2012

Turbine gets a beach hut

There are only a couple of weeks to go now until the turbine is finished, so it's just getting its final touches, including the fish and eel passes and housing for the turbine generator - which I think looks like a nice little beach hut...

This is Dave, from Mackleys, looking a little apprehensive when it arrived flat packed:

Dave contemplating building the shed (NTPL/Caroline Pankhurst)

But in no time at all the little shed was built over the generator turbine.

The generator housing (NTPL/Caroline Pankhurst)

The electricity to the whole stable yard was cut off for a few hours while the electricians wired the turbine up to the meters in the stable yard plant room. This means that we'll be able to see how much electricity it's generating, not just on the meter but also on our energy read-outs screen in the lobby (where visitors can also see how much power is coming from the solar panels and other sources too).

Mike from G A Electrical sorts out the electrics in the shed (NTPL/Caroline Pankhurst)

The energy read-outs screen (and cable drum rocking chairs) in the stable yard lobby
(NTPL/Caroline Pankhurst)

The fish and eel passes are also complete, the black one for the fish and the green brushy one for the eels:

The green eel pass and the black fish pass (NTPL/Caroline Pankhurst)

It won't be too long now till the Screw is turning and the fish and eels are swimming happily past it.
  
 The latest view of the whole site (NTPL/Caroline Pankhurst)