National Trust logo

The 19th century stable yard

The 19th century stable yard
NTPL Zoë Colbeck

Wednesday, 15 June 2011

Sliding Doors

The heart-stopping moment when a door was launched into the air. NTPL/Lucy Alfred

Like the plot of their cinematic namesake, the tale of our bespoke, triple glazed, sliding doors by Vitrosca has not been straightforward. Although, after two dramatic and failed attempts they have now been installed in the exhibition space of the stable yard.

Two weeks ago we excitedly rushed out to watch them being installed, only to discover that the suction pads used to install them weren’t working on the first machine and the second one was the wrong design for the job. Our hearts were in our mouths when they removed the suction pads on the second attempt as the whole door wobbled from end to end like one of Rolf Harris’s “wobble boards”! The door escaped damage free because, as we were later assured, it can withstand harder wear than that.

This week the ‘third time lucky’ mantra came into full force as the seven doors were painstakingly and expertly manoeuvred by the team who lifted, twisted and inched the doors into place. There were some heart stopping moments such as when the crane lifted two of the doors several metres into the air, but as the experts seemed pretty relaxed we swallowed our panic and busied ourselves with taking photos of the process!

Coming all the way from Portugal the doors are fairly unique in the UK as triple glazing is much more popular in mainland Europe. The energy efficient panels are filled with viscous argon gas which separates the three panes in each sliding door. Argon is used rather than air as it is a much denser gas, making it a poor conductor of heat, meaning greater insulation. During the winter the doors will form as airtight a seal as possible, keeping heat inside the exhibition space, while allowing a comfortable stream of air in the summer months when they can be slid open.

All we have to do now is decide upon the design of the transfers that will go onto the doors, to remind wildlife (and people!) that they are in fact solid glass doors and not open spaces!

Monday, 6 June 2011

Busy Bees

The bees are given a new home. NTPL/Caroline Pankhurst



The stall partitions are put back in place. NTPL/Jon Whitehead



The giant rainwater harvesting tanks. NTPL/Sarah Tebbot



Hi, I’m Caroline and I’ve just taken over as the new Project Coordinator – coordinating the final stages of the building up to its grand opening later in the year!




It’s been a busy and exciting first week. The stable yard looks different every day at the moment, with the builders making the most of all the fine weather. All three sets of solar panels are now shining in the sun, the four giant rainwater harvesting tanks are in place (complete with hand pump for people to pump water into the ladies’ toilets!), the air source heat pump is installed and the original metal stable stall partitions have been put back in place to divide the new craft stalls. Today there’s a big crane filling the stable yard, lifting the triple-glazed glass doors into place for the new exhibition space.

We’ve also had some unexpected visitors to the site one day this week – some bumble bees who decided to make their nest just where the builders wanted to fit the new glass doors. Luckily Wimbledon Beekeepers came to the rescue and moved the bees to a happy new home in a tree in the park.

Friday, 20 May 2011

Are you sitting comfortably?

The reduce, reuse, recycle mantra is very much in our minds at the Heart of the Park project, particularly as we are trying to divert as much site waste from landfill as possible. So when Julie visited the site a few weeks ago for one of our taster days and asked if she could have one of the wooden pallets that were headed for the skip for a recycling project, we were only too happy.

Doing the green thing isn’t without its challenges says Julie, “we thought we had bitten off more than we could chew as it was the 'devils own job' to take it apart. No wonder they are so difficult to recycle!!!

However, Julie and her father persevered and we’re glad that they did, as a few weeks later they have transformed the pallet into this lovely chair. “It's a design we copied from something we saw on the internet so I can't take credit for (it).” We love it though and hope that Julie can now put her feet up and take a well earned rest.

Thursday, 21 April 2011

Morden Hall Park looks fantastic in the sunshine, and plenty of visitors are out and about enjoying the beautiful weather. Our Easter Egg Hunt kicks off today too - let's hope the weather stays sunny for the next days of the event on Saturday, Sunday and Monday!

This week the two Zoës (Zoë Colbeck, Property Manager and Zoë Adams, Community Projects Manager) took a trip to our Livinggreen partner project in Ludwigsburg to catch up with the other project teams.


The team in Ludwigsburg are hard at work transforming a listed Flak-hall building (an old barracks gym) to be a demonstration of sustainable reconstruction. They're using a clever 'house-in-house' technique to protect the historic shell of the building, whilst the building inside will allow for innovative energy saving techniques. All very clever stuff! The Flak-hall is going to be a new child and family centre for Ludwigsburg, and it's great to think of the future generations who will be inspired by this eco building. Here's a picture of the outside of the building.



We also had the opportunity to take a quick stroll in the beautiful Baroque gardens surrounding Ludwigsburg Palace.



Finally, our hospitable hosts gave us the chance to try some local Ludwigsburg culture, after all, when in Germany...

Happy Easter from Morden Hall Park!











Monday, 18 April 2011

Lime - naturally green

The third in our series of taster days took place last week. This time the focus was on lime plaster with an informative and accessible presentation by Nigel from The Lime Centre, followed by an on-site demonstration of lime plastering.

Besides learning about the benefits of using lime in historic building projects such as the Heart of the Park project, the non-chemists among us also learnt about an additional benefit which is particularly relevant to our project. Cement and lime both give off considerable amounts of CO2 in production but unlike lime, which reabsorbs between 45% and 61% of CO2 per ton depending on the strength grade, cement does not reabsorb any CO2 as it dries. Some of the new, low energy materials that we are using in the renovation actually contain a large amount of embodied carbon. Lime, however, is one product that wears its green credentials on its sleeve.

Friday, 8 April 2011

PV-T: 2-4-1 solar power

The sun is shining which makes it the perfect day (apart from yesterday and with any luck the weekend as well) to introduce the latest addition to the stable yard: an array of 22 Photovoltaic-Thermal (PV-T) panels.  These innovative solar panels, manufactured by Newform Energy , have now been installed on the south-facing roof of the stable yard. 

A PV-T panel is a single solar collector or panel which generates electricity and heats water. It does this by combining a photovoltaic (PV) collector with a high efficiency solar thermal collector underneath. 

Strange as it sounds, PV collectors work most effectively at lower temperatures. Less hard to believe, especially on a sunny day like today, is that the surface temperature on the collector can reach 100˚C on a sunny summer’s day in England. At this temperative, the collector's efficiency is greatly reduced with the result that it could produce as little as 10% of its maximum output. 

The magic of the PV-T is that the thermal collector uses a fluid cooling system to draw excess heat away from the PV collector and therefore improve its efficiency. This excess heat is then used to heat water which will be used in the stable yard in under-floor heating and for handwashing.

Although bulkier than conventional PV panels, PV-T have the advantage of being up to 40% more efficient than the conventional PV panels which have been installed on the west facing roof. 

The PV-T on the south-facing roof. NTPL/Nancy Falloon
The PV-T, PV panels and PV slates will be commissioned (wired up) later on in the renovation work. 

Tuesday, 29 March 2011

Rocketeers - tidying the planet one apple core at at time

Morden Hall Park's Rocketeers
More excitement last week following the arrival of our very own A700 Rocket® composter! Imagine a compost bin with better looks and an attitude and you’ve got the Rocket Composter. Manufactured and installed by Tidy Planet, it is an impressive piece of kit that digests food waste, speedily turning it into usable compost in just two weeks. What’s more, it actually looks like a rocket!
Gwen, Tidy Planet’s master composter, was on hand to teach the new team of Rocketeers how to feed and take good care of the Rocket. It will be enjoying a tasty diet of fresh scraps and cooked leftover food (including meat and fish) from Morden Hall Park’s Riverside Café, as well as garden waste treats from the park. And if it's really good we even might let it have some leftover ice cream from the ice cream parlour in the stable yard when it opens following the renovation work.
 
Ian, our assistant gardener, feeding the Rocket